Project Name: CIAO Facility Rehabilitation Project

                             

 

Client:   Kennedy Space Center, SBA office

 

Description: Scope of work for this project includes, removing 865 s.f. of floor tile with asbestos mastic, clean and prep floors to receive new tiles, continuous air monitoring throughout the process and removal and disposal of asbestos mastic. Pressure wash and paint the exterior of the building. Replace missing foam insulation between corrugated roof/wall panels. Install Celotex ¾” insulation board under storefront windows. Install 865s.f. of new floor tiles and wall base. Remove and replace 3200 s.f. of 2’x4’ of ceiling tiles. Demo three latrines, floor tile, wall tile, vanities, mirrors, toilets and all other fixtures. Install backer board on walls, install new tile to walls, sanitary base and grout install floor tile  and grout., ADA rails, new plumbing fixtures, replace door casings, paint install mirrors, dispensers, paint, replace door hardware and handles.

CIAO Facility Rehabilitation Project

DDI SOUTHEAST

1101 IDLEWILD AVENUE (SR 16)

GREEN COVE SPRINGS, FL 32043

(904) 657-2223

  • LinkedIn B&W
  • Facebook B&W
  • Google+ B&W

Copyright © 2017 DDI - Southeast.  All Rights Reserved.